Products SlideShow

Please wait while JT SlideShow is loading images...

Civil & M/E Works Design for Development Phase 1 of Storage Tanks Total Capacity 100,000 MT

Development Phase 1 of Storage Tanks Total Capacity 100,000 MT for PT. Prima Tangki Indonesia at Area of ± 3,5 HA  Located at Kawasan Pelabuhan Pelindo 1, Kuala Tanjung, Batubara Regency, North Sumatera Province (2016)

 

 

 

 

 

Contact Us

PT Lyduma Intermas Consultant

Soil and Foundation Investigation, Architecture and Civil Engineering,
Planning and Project


Jl. Abdullah Lubis No. 37/25
Medan 20214
Phone : (6261) 4148585(Hunting)
Fax : (6261) 4560940
Email : lic@indo.net.id

Calendar

S M T W T F S
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

Time